In 2006 LBBJV purchased all the cranes for the TBM (Tunnel Boring Machine) launch site at Bowen Hills for the Chlem 7 tunnel construction. Among those cranes was a fully customised 260t overhead crane, this crane was 100% designed and manufactured in Australia at Eilbeck Cranes Ingleburn NSW plant.
The crane was taken from concept design and delivered to site in 14 weeks from placement of order. A delivery schedule which is something that Eilbeck Cranes has a well-earned reputation for.
Crane lifting the Tunnel Boring Machine components.